Goldratts The GoalThe Goal by Goldratt is a playscript about the Theory of Constraints, TOC. It is about the behavior of manufacturing facilities. It deals with bottlenecks that ar the manufacturing constraints and the variability that creates them. The book of account states that a manufacturing make-up cannot run at 100% and that you cannot balance the throng line. It seems that your efforts for strength must be foc designd on the worst bottleneck. The bolshy ca apply by a bottleneck is a loss for the entire system. pore on improving the finishedput of the bottleneck increases the flow for the entire manufacturing line. If there is a bottleneck, whence all other areas are capable of excess capacity. forefathert try to improve non-bottlenecks, as it is a waste of eon and effort. The TOC integrates into Total Quality Management, TQM, except for one main theory. TQM supports continuous progress of the system while the TOC does not support continuous improvement of either process. The TOC says that we must focus on the constraint.Q What is the Theory of Constraints about? A developed by Dr. Eliyahu M. Goldratt, TOC states that any system has at least one constraint. Otherwise, it would be generating an infinite amount of output. Bearing this in mind, TOC is easily explained through use of the chain analogy - a chain is only as watertight as its weakest link. If we look upon our organization as a chain, where each segment is a link in the chain, what constrains our organization from achieving its goal? Only through addressing the weakest link, the constraint, can substantial improvements be made. In other words, if the constraint dictates the step of an organizations ability to achieve its goal, it makes sense that addressing the constraint will allow the organization to achieve a substantial rate of throughput faster.There are five dollar bill steps in applying TOC 1.Identify the systems constraints. Of necessity this included prioritization so that skillful the ones that really limit system progress toward the goal. 2.Decide how to exploit the systems constraints. erst we have decided how to manage the constraints within the system, how about the majority of the resources that are not constraints? The answer is that we manage them so that they just provide what is essential to match the output of the constrained resources. We NEVER let them supply mo... ...achine was lead and an operator on your line was to set it up if it went down, you could take your sacrifice at your convenience. A few months went by and upstart coaches were hired. They decided they valued to closely monitor the operator to see when they took their breaks and for how long. The decision was made to stop consonant the machines when you go on your break and/or lunch. The new coach ostensibly wanted to make a good impression and bring something new to the table. They changed our staggered breaks to scheduled breaks. The results after a few weeks showed production was down and efficiency was at a record low. It showed machines were not running at ripe capacity for a tour. Immediately their superiors decided we would go back to the staggered lunches and breaks. The downtime was then reduced and our departmental efficiency went up. They realized it was not as classical to monitor the person, as it was to have the machine running. Now I go this does not stand up to the problems Alex and his staff faced with UniCo but this is what I face everyday. I found a case study that was used at the TOC World 2000 Seminar in St. Paul MN last year. I thought I would include it for your enjoyment
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment